| Sl No. | Parameters | As on 31.03.20 | |
|---|---|---|---|
| a) | No of consumer ( in Lac.) | 200.54 | |
| b) | Distribution Network detail | ||
| i) | 33KV Line length (Ckm) | 17279 | |
| ii) | 11KV Line length (Ckm) | 176098 | |
| iii) | LT Line length (Ckm) | 348560 | |
| iv) | No of 33/11KV S/Stn (Nos.) | 700 | |
| v) | Aggrigated Capacity of 33/11 KV Sub-station (MVA) | 12064.45 | |
| vi) | No of Distribution Transformer (Nos.) | 284002 | |
| vii) | Aggrigated Capacity of Distribution transformer (MVA) | 14006.24 | |
| c) | Distribution loss (%) during FY 2019-20 | 19.99 | |
| CONSTITUENT | STATION | IC (MW) | UTILITY WISE TOTAL IC (MW) | STATE SHARE (MW) |
| WBSEDCL | PURULIA PUMPED STORAGE PROJECT | 900 | ||
| WBSEDCL | RAMMAM HYDEL PROJECT, STAGE – II | 51 | ||
| WBSEDCL | TEESTA CANAL FALL HYDEL PROJECT | 67.5 | ||
| WBSEDCL | JALDHAKA HYDEL PROJECT | 44 | ||
| WBSEDCL | RANIGUNJ CHALBALPUR GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | DHAKA-II, RAJNAGAR GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | DHAKA-I, RAJNAGAR GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | KHEMASULI (PATNI) GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | SALBONI GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | MEJIA, BANKURA GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | CHARRAH GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | SANTALDIH (STPS) GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | TEESTA CANAL BANK SOLAR PV POWER PROJECT | 10 | ||
| WBSEDCL | CANAL TOP OF TCFHP TAIL RACE CANAL, STAGE II POWER STATION AT HAPTIAGACHH | 10 | ||
| MINI-MICRO HPS (6 NOS) | ||||
| WBSEDCL | SIDRAPONG SHP | 0.4 | ||
| WBSEDCL | LITTLE RANGIT SHP | 2 | ||
| WBSEDCL | FAZI SHP | 1.2 | ||
| WBSEDCL | RINCHINGTON SHP | 2 | ||
| WBSEDCL | MANGPOO KALIKHOLA SHP | 3 | ||
| WBSEDCL | MASSANJORE SHP | 4 | ||
| TOTAL MINI-MICRO | 12.6 | |||
| WBPDCL_TOTAL | 1175.1 | 1175.1 | 1175.1 | |
| CONSTITUENT | STATION | IC (MW) | UTILITY WISE TOTAL IC (MW) | STATE SHARE (MW) |
| WBSEDCL | BTPS | 335 | ||
| WBSEDCL | STPS | 500 | ||
| WBSEDCL | KTPS | 1260 | ||
| WBSEDCL | BkTPP | 1050 | ||
| WBSEDCL | SgTPP | 1600 | ||
| WBPDCL_TOTAL | 4745 | 4745 | 4745 | |
| TOTAL SOLAR | 60 | 60 | ||
| MINI-MICRO HPS( 6 NOS) | ||||
| TOTAL MINI-MICRO HPS | 19.048 | 19.048 | ||
| WBSEDCL_TOTAL | 1135.548 | 1135.548 | 1135.548 | |
| PRIVATE MINI-MICRO | LODHAMA SHP | 3 | ||
| PRIVATE MINI-MICRO | NEORA SHP | 3 | ||
| MINI-MICRO TOTAL | 6 | 6 | 6 | 6 |
| DPL | UNIT 6 | 110 | ||
| DPL | UNIT 7 | 300 | ||
| DPL | UNIT 8 | 250 | ||
| DPL TOTAL | 660 | 660 | 660 | |
| CESC | BUDGE-BUDGE TPS | 750 | ||
| CESC | SOUTHERN TPS | 135 | ||
| CESC | TITAGARH TPS | 240 | ||
| CESC TOTAL | 1125 | 1125 | 1125 | |
| HALDIA ENERGY LIMITED HEL(CESC SUBSIDIARY) | 600 | 600 | 600 | |
| Hiranmoyee Energy Ltd.(IPC(H)L) | 300 | 300 | 300 | |
| IPP/CPP | CRESCENT POWER LTD. CPL | 40 | ||
| IPP/CPP | CRESCENT POWER LTD. CPL | 40 | ||
| IPP/CPP | PHILIPS CARBON BLACK LTD PCBL | 30 | ||
| IPP/CPP | TATA POWER HALDIA | 120 | ||
| IPP/CPP_TOTAL | 190 | 190 | 190 | |
| SMALL IPP/CPP | SRI RENUKA SUGAR | 15 | ||
| SMALL IPP/CPP | CONCAST BENGAL | 25 | ||
| SMALL IPP/CPP | AMRIT BIO ENERGY | 10 | ||
| SMALL IPP/CPP | BEL | 40 | ||
| SMALL IPP/CPP | HIMADRI CHEMICAL | 20 | ||
| SMALL IPP/CPP | RESHMI CEMENT | 18 | ||
| SMALL IPP/CPP | ENNORE COKE | 8 | ||
| SMALL IPP/CPP | ELECTRO STEEL | 12 | ||
| SMALL IPP/CPP | KAMARHATI BIOMASS | 6 | ||
| TOTAL | 154 | 154 | 154 | |
| SMALL IPP/CPP | SIIIPL(SOLAR) | 5 | 154 | 154 |
| SMALL IPP/CPP | HINDUSTAN POWER (SOLAR) | 5 | 154 | 154 |
| SMALL IPP/CPP | OCL(SOLAR) | 5.5 | 154 | 154 |
| TOTAL | 15.5 | 15.5 | 15.5 | |
| NTPC LTD | FARAKKA Stage I & II | 1600 | ||
| NTPC LTD | FARAKKA Stage III | 500 | ||
| TOTAL NTPC LTD | 2100 | 2100 | 699.08 | |
| NSPCL | DURGAPUR JV OF NTPC- SAIL | 120 | 120 | |
| NHPC LTD | TLDP-III | 132 | ||
| NHPC LTD | TLDP-IV | 160 | ||
| TOTAL NHPC LTD | 292 | 292 | 292 | |
| DVC (WB) | MEJIA THERMAL POWER STATION | 2340 | ||
| DVC (WB) | DURGAPUR THERMAL POWER STATION | 210 | ||
| DVC (WB) | DURGAPUR STEEL THERMAL POWER STATION | 1000 | ||
| DVC (WB | RAGHUNATHPUR TPS | 1200 | ||
| DVC (WB) | MAITHON HPS | 63.2 | ||
| TOTAL DVC (WB) | 4813.2 | 4813.2 | 50 | |
| GRAND TOTAL | 16256.248 | 16256.248 | 9977.128 |
| CONSTITUENT | STATION | IC (MW) | % ALLOCATION OF POWER | POWER ALLOCATION(MW) |
| NTPC LTD | TSTPP (NTPC) | 1000 | 9.21 | 92.1 |
| EX-BHUTAN | CHPC (BHUTAN) | 336 | 31.85 | 107.016 |
| EX-BHUTAN | KURICHU (BHUTAN) | 60 | 50 | 30 |
| EX-BHUTAN | RANGEET (BHUTAN) | 60 | 28.34 | 17.004 |
| EX-BHUTAN | TALA (BHUTAN) | 1020 | 38.25 | 390.15 |
| EX-BHUTAN | TESTA (BHUTAN) | 510 | 23.98 | 122.298 |
| NTPC LTD | KHSTPP (NTPC) | 2340 | 7.07 | 165.438 |
| NTPC LTD | DARLIPALI | 800 | 18.35 | 146.8 |
| NTPC LTD | MTPS-II | 390 | 9.63 | 37.557 |
| EX-BHUTAN | MANGDECHU | 720 | 32.14 | 231.408 |
| JAMMU AND KASHMIR | BAGHLIER | 450 | 100 | |
| ADHUNIK POWER | 540 | 100 | ||
| MAITHON POWER LTD | 1050 | 282.75 | ||
| TOTAL OUT SIDE POWER | 9276 | 1822.521 |
| Total No. of EHV Sub-Station | 128 nos. |
| Total Installed MVA Capacity | 32671 MVA |
| Total EHV Lines | 13935 CKM |
| Amount of energy handled per year ( in MU ) |
|
| Achievement of the individual Entities to be highlighted |
|
| Sl No. | Parameters | As on 31.03.18 | |
|---|---|---|---|
| a) | No of consumer ( in Lac.) | 181.13 | |
| b) | Distribution Network detail | ||
| i) | 33KV Line length (Ckm) | 14815 | |
| ii) | 11KV Line length (Ckm) | 163561 | |
| iii) | LT Line length (Ckm) | 333277 | |
| iv) | No of 33/11KV S/Stn (Nos.) | 590 | |
| v) | Aggrigated Capacity of 33/11 KV Sub-station (MVA) | 9815.75 | |
| vi) | No of Distribution Transformer (Nos.) | 253276 | |
| vii) | Aggrigated Capacity of Distribution transformer (MVA) | 11815 | |
| c) | Distribution loss (%) during FY 2017-18 | 26.65 | |
| CONSTITUENT | STATION | IC (MW) | UTILITY WISE TOTAL IC (MW) | STATE SHARE (MW) |
| WBPDCL | BTPS | 335 | ||
| WBPDCL | STPS | 500 | ||
| WBPDCL | KTPP | 1260 | ||
| WBPDCL | BkTPP | 1050 | ||
| WBPDCL | SgTPP | 1600 | ||
| WBPDCL_TOTAL | 4745 | 4745 | 4745 | |
| WBSEDCL | PURULIA PUMPED STORAGE PROJECT | 900 | ||
| WBSEDCL | RAMMAM HYDEL PROJECT, STAGE – II | 51 | ||
| WBSEDCL | TEESTA CANAL FALL HYDEL PROJECT | 67.5 | ||
| WBSEDCL | JALDHAKA HYDEL PROJECT | 44 | ||
| WBSEDCL | TEESTA CANAL BANK GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | MEJIA BANKURA GROUND MOUNTED SOLAR PROJECT | 10 | ||
| WBSEDCL | CHARRAH, PURULIA GROUND MOUNTED SOLAR PROJECT | 9 | ||
| MINI-MICRO HPS (6 NOS) | ||||
| WBSEDCL | SIDRAPONG SHP | 0.4 | ||
| WBSEDCL | LITTLE RANGIT SHP | 2 | ||
| WBSEDCL | FAZI SHP | 1.2 | ||
| WBSEDCL | RINCHINGTON SHP | 2 | ||
| WBSEDCL | MANGPOO KALIKHOLA SHP | 3 | ||
| WBSEDCL | MASSANJORE SHP | 4 | ||
| TOTAL MINI-MICRO | 12.6 | |||
| WBSEDCL_TOTAL | 1104.1 | 1104.1 | 1104.1 | |
| PRIVATE MINI-MICRO | LODHAMA SHP | 3 | ||
| PRIVATE MINI-MICRO | NEORA SHP | 3 | ||
| MINI-MICRO PRIVATE TOTAL | 6 | 6 | 6 | |
| DPL | UNIT 6 – | 110 | ||
| DPL | UNIT 7 – | 300 | ||
| DPL | UNIT 8 – | 250 | ||
| 660 | 660 | 660 | ||
| CESC | BUDGE –BUDGE THERMAL POWER STATION | 750 | ||
| CESC | SOUTHERN THERMAL POWER STATION | 135 | ||
| CESC | TITAGARH THERMAL POWER STATION | 240 | ||
| TOTAL | 1125 | 1125 | 1125 | |
HALDIA ENERGY LIMITED HEL (CESC SUBSIDIARY)
|
600 | 600 | 600 | |
| IPC(H)L | 150 | 150 | 150 | |
| IPP/CPP | CRESCENT POWER LTD. CPL | 40 | ||
| IPP/CPP | PHILIPS CARBON BLACK LTD PCBL | 30 | ||
| IPP/CPP | TATA POWER HALDIA | 120 | ||
| IPP/CPP_TOTAL | 190 | 190 | 190 | |
| SMALL IPP/CPP | SRI RENUKA SUGAR | 15 | ||
| SMALL IPP/CPP | CONCAST BENGAL | 25 | ||
| SMALL IPP/CPP | AMRIT BIO ENERGY | 10 | ||
| SMALL IPP/CPP | BEL | 40 | ||
| SMALL IPP/CPP | HIMADRI CHEMICAL | 20 | ||
| SMALL IPP/CPP | RESHMI CEMENT | 18 | ||
| SMALL IPP/CPP | ENNORE COKE | 8 | ||
| SMALL IPP/CPP | ELECTRO STEEL | 12 | ||
| SMALL IPP/CPP | KAMARHATI BIOMASS | 6 | ||
| TOTAL | 154 | 154 | 154 | |
| SMALL IPP/CPP | HINDUSTAN POWER (SOLAR) | 5 | ||
| SMALL IPP/CPP | OCL(SOLAR) | 5.5 | ||
| TOTAL | 10.5 | 10.5 | 10.5 | |
| NTPC LTD | FARAKKA UNIT#1-3 | 600 | ||
| NTPC LTD | FARAKKA UNIT#4-6 | 1500 | ||
| TOTAL NTPC LTD | 2100 | 2100 | 718 | |
| NSPCL | DURGAPUR JV OF NTPC- SAIL | 120 | 120 | 0 |
| NHPC LTD | TLDP-III | 132 | ||
| NHPC LTD | TLDP-IV | 160 | ||
| TOTAL NHPC LTD | 292 | 292 | 292 | |
| DVC (WB) | MEJIA THERMAL POWER STATION | 2340 | ||
| DVC (WB) | DURGAPUR THERMAL POWER STATION | 210 | ||
| DVC (WB) | DURGAPUR STEEL THERMAL POWER STATION | 1000 | ||
| DVC (WB) | RAGHUNATHPUR TPS | 1200 | ||
| DVC (WB) | MAITHON HPS | 63.2 | ||
| TOTAL DVC (WB) | 4813.2 | 4813.2 | 50 | |
| GRAND TOTAL | 16069.8 | 16070 | 9805 | |
IN ADDITION TO 9805 MW, THE STATE ALSO GETS POWER FROM OTHER ISGS LOCATED OUTSIDE THE STATE AS FOLLOWS-
|
||||
| CONSTITUENT | STATION | IC (MW) | % ALLOCATION OF POWER | POWER ALLOCATION(MW) |
| NTPC LTD | TSTPP (NTPC) | 1000 | 10.129117 | 101.29117 |
| EX-BHUTAN | CHPC (BHUTAN) | 336 | 31.85 | 107.016 |
| EX-BHUTAN | KURICHU (BHUTAN) | 60 | 50 | 30 |
| EX-BHUTAN | RANGEET (BHUTAN) | 60 | 28.34 | 17.004 |
| EX-BHUTAN | TALA (BHUTAN) | 1020 | 38.25 | 390.15 |
| EX-BHUTAN | TESTA (BHUTAN) | 510 | 23.98 | 122.298 |
| EX-BHUTAN | KHSTPP (NTPC) | 2340 | 7.908234 | 185.0526756 |
| JAMMU AND KASHMIR | BAGHLIER | 450 | 100 | |
| ADHUNIK POWER | 540 | 100 | ||
| MAITHON POWER LTD | 1050 | 282.75 | ||
| TOTAL OUT SIDE POWER | 1436 | |||
As part of State Government initiative on promotion of Renewable Energy in the state 2 Solar Artifacts (Tree) @ 3.2KWP each were installed and made operational by WBREDA on 25th May, 2018 at Bidyut Unnayan Bhawan, Salt Lake, Kolkata. Shri Sobhandeb Chattopadhyay, Hon'ble MIC, Power & NES Department declared the Solar Artifacts operational in the August presence of Shri Sunil Kumar Gupta, Additional Chief Secretary, Shri Rajesh Pandey, CMD WBSEDCL, Shri Santanu Basu, CMD WBPDCL.
Advantages of Solar Artifacts: